Project Overview
The Pawtucket Tunnel Project is owned by the Narragansett Bay Commission. It is part of the Restored Waters project, awarded to CB3A Joint- Venture.
This third and final phase, the previous phases completed in 2008 and 2015, is anticipated to be in operation in 2027. Phase IIIA was delivered as a design-build project and includes a main 11,600- lf. long, 30-ft. diameter conveyance and storage tunnel, pumping station, shafts, and multiple adit tunnels. Combined, the previous and newly constructed tunnels and facilities will capture and control stormwater and send it to the Bucklin Point Wastewater Treatment Facility to clean up the Narragansett Bay and comply with the federal Clean Water Act.
SEI was subcontracted to construct a critical adit tunnel (#213) that intersects with the larger 30-ft. diameter stormwater tunnel under the Seekonk River.