City Trunk Line South Unit 3 – SL82P MTBM Face-Access system, MixedFace Disc Cutter Head

Project Name
City Trunk Line South Unit 3
Subcontractor
W.A. Rasic Construction
Location
North Hollywood, CA
Ground Conditions
Packed Silt, Some Cobble, Gravels and Sands
Akkerman Equipment
SL82P MTBM Face-Access system, Mixed- Face Disc Cutter Head
Pipe
82-in. OD Permalok® and 60-in. Mortor Lined Steel Casing as Carrier
Total Length/Hard Rock Section
3,073-lf./1,033-lf.

Project Overview

The City Trunk Line South Unit 3 is part of the LADWP’s Capital Improvement Program to replace a 102-year-old water pipeline in North Hollywood. The project includes 5,357-lf. of 60 and 72-inch steel casing for completion by open trench and microtunneling pipe jacking construction. Of this footage, four tunnels totaling 3,073-lf. were approved for installation with an Akkerman MTBM system. When completed, the bores would be connected to existing trunk lines.

Challenges

• Project site in a heavily congested commercial and residential area

• Complex traffic control plan and phasing

• Extensometers and inclinometers to monitor settlement

• Noise-canceling system with sound blankets to minimize construction noise

• Installations at up to 32-foot depths • First time this contractor used an MTBM as the self-performing contractor

Solution

The subcontractor utilized an SL82P Periphery Drive Microtunnel Boring Machine with Face-Access to complete all tunnels.

Outcome

Four alignments successfully completed with precision accuracy, without disruption