Cased Augers & Heads

Temporary Thrust Casing and Auger assemblies are positioned directly behind a reaming head, which follows the pilot tubes. The reaming head increases the bore diameter, and the augers transport spoil to the launch shaft.

The Integral Bearing Swivel Cutter is an upsizing tool between the pilot tube adapter and the lead thrust casing. It is used in ground conditions above 35 blow count and functions to keep the pilot tubes stationary. Simultaneously, the cutter bit rotates to excavate the soil, and fluid ports release lubrication to reduce cutting torque. Integral Bearing Swivel Cutters are available in standard and HD models to match the thrust casing assemblies.

FEATURES:

Thrust Casing & Auger Assemblies

  • Available in 11‑in OD, 16‑in OD standard, and 16‑in OD heavy‑duty versions.
  • Casings connect using retaining clips.
  • Supplied in a convenient wire basket for easy transport.

Integral Bearing Swivel Cutter

  • Mates to the lead thrust casing assembly.
  • Used in ground conditions above 35 blow count.
  • Absorbs auger rotation to keep the pilot tube string stationary.
  • Cutter bit tooling excavates the ground.
  • Cutter bit fluid ports provide lubrication to reduce cutting torque.

SPECIFICATIONS

Print This Page

Thrust Casing and Auger Assembly

ModelLengthMax. Thrust / TorqueWeight Ea.
11-in.1 m100 ton / 10,500 ft‐lb265 lbs.
16-in.1 m100 ton / 10,500 ft‐lb400 lbs.
16-in. HD60-in.200 ton / 21,000 ft‐lb570 lbs.
11-in. SCH43-in.70 ton / 10,500 ft-lbf700 lbs.
16-in. SCH43-in.100 ton / 21,000 ft-lbf1,200 lbs.

Testimonials

It is great to see a family-owned company in the tunneling industry continue to succeed and progress with their next generation of leadership at the helm. Akkerman continues to put cutting edge technology in the hands of contractors like ourselves that enable our talented people to do what we love to do: put pipe in the ground precisely online and grade! Whether it’s a guided boring system, a custom-built TBM, top notch field technician support on a Microtunnel drive, or the gathering of the industry’s top experts at one of their “Akktoberfests” to educate us all; they are doing things the right way. Akkerman has played a big role in our company’s success in the trenchless industry and we look forward to working with them for years to come.