Akkerman MTBM jacking frames are built to deliver high thrust capacity while minimizing launch shaft requirements. The multi-cylinders keyhole design applies thrust loads through the center of the pipe axis minimizing stress concentration on pipe joints. MTBM jacking frames are remotely controlled from the surface or can be pendent controlled from a power pack and used for other pipejacking methods with a service bay attachment.

FEATURES:

  • Keyed thrust cylinders are interchangeable between units to reduce cost.
  • Additional thrust cylinders can be added on MT8102K and larger jacking frames to increase capacity for extended drives.
  • Curved or flat reaction walls are optional.
  • Hydraulic plumbing is efficiently routed for synchronized cylinder operation.
  • Auxiliary hydraulics allow quick pullback of the thrust block or operation of portal seal pipe break.
  • Hi‑flow return valve enables quick cycle times between thrusts.
  • Reaction wall designed for tunnel guidance system placement and tool storage.
  • Standard pipe length is 10 ft; extension kits available for pipe sets up to 20 ft.
  • Service bays available for TBM projects.
  • Frame designed for in‑shaft assembly to reduce crane size requirements.
  • Minimum shaft size varies by configuration: 16 ft to 24 ft.

SPECIFICATIONS

Print This Page
ModelThrustPipe ODEst. Weight
MT 460K400 ton30-60 in.27,000 lbs.
MT860K800 ton30-60 in.30,000 lbs.
MT875K800 ton60-75 in.40,000 lbs.
MT890K800 ton75-90 in.43,500 lbs.
MT8102K1200 ton90-102 in.58,000 lbs.
MT8108K1200 ton90-108 in.72,500 lbs.
MT8114K1200 ton102-114 in.75,000 lbs.

Weights dependent on configuration of final unit.

Testimonials

Lithos Engineering is focused on providing tunnel design and construction management for underground construction projects across the United States and has worked with many different tunnel contractors on projects of varying sizes and complexity. I am always happy
to see Akkerman equipment on our project sites and I know we can rely on Akkerman products for a high level of performance and reliability.

I had the pleasure of working with Akkerman on one of our projects for which they designed and constructed a project specific hard rock TBM for a curved water conveyance tunnel high in the Rocky Mountains of Colorado. Akkerman not only provided great solutions and technical support for the project but was a pleasure to work with in a collaborative teaming environment that allowed us to not only reduce project risks but reduce construction costs and schedule. During that project, I visited the Akkerman production facility to inspect the TBM under construction; I was extremely impressed with the Akkerman management, staff, and systems for quality control. I look forward to a long future of working with Akkerman and their products on our tunneling projects.