Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2 – GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head

Project Name
Nicollet Mall Sanitary Sewer Replacement, Phase 1 & 2
General Contractor
Minger Construction, Inc.
Location
Minneapolis, MN
Ground Conditions
Cobbles, Granular Materials
Akkerman Equipment
GBM 4800 Jacking Frames, Guidance Systems, PCH 20 Cutter Head
Pipe
30-in. Steel Casing, 12, 15 & 18-in. ID NO- DIG® Vitrified Clay Pipe, 2m joints
Total Length/Hard Rock Section
1,800-lf./425-lf.

Project Overview

The City of Minneapolis’s sewer system was originally constructed in the 1890s and in need of capacity upgrades and new extensions as part of the Nicollet Mall re-imaging effort in the heart of downtown. The highly urbanized region had many subsurface utilities and above ground buildings and structures.

Challenges

• Need to preserve live traffic and public access to businesses

• Construction around existing structures and landscaping

• Line and grade accuracy was necessary to circumvent many existing buried utilities

• Varying ground up to 20-ft. depths with pockets of cobble

• Minimal space for construction equipment and pipe staging

• Installation conducted during cold winter months

• Need for carefully phased construction planning and communication with project team

Outcome

• Successfully installed 1,800-lf. of sewer alignments in nine runs at up to 20-ft. depths

• Completed ahead of schedule and under budget