Twinning of the Etobicoke Creek Trunk Sanitary Sewer – SL86P MTBM, AZ100 TGS

Project Name
Twinning of the Etobicoke Creek Trunk Sanitary Sewer
General Contractor
CRS Tunnelling Inc.- Dibco Underground, JV
Location
Mississauga, ON
Ground Conditions
Varying - granular till, riverbed deposits, shale bedrock
Akkerman Equipment
SL86P MTBM, AZ100 TGS
Pipe
1,800-mm
Total Length/Hard Rock Section
576 m

Project Overview

The Twinning of the Etobicoke Creek Sanitary Sewer involved the microtunneling construction of approximately 576 m of 1,800 mm internal diameter trunk sanitary sewer underneath runways and taxiways at the Lester B. Pearson International Airport (LBPIA).

The new sewer, runs parallel with the existing sewer to increase capacity and allow for redundancy, diversion and inspection.

Challenges

• LBPIA is Busiest Airport in Canada

• Tunnel construction could not interrupt airport operations

• Ground conditions included granular till, riverbed deposits and shale

• Tunnel construction alongside Spring Creek

• Specified contingency measure to include hyperbaric equipment package for tooling changes from MTBM interior

• Crane height limitations, equipment setbacks

• Complex permitting, approval, safety, security and contingency processes for construction on airport property • High traffic near shaft locations

Solution

Use of Akkerman SL86P microtunneling system with face access

AZ100 Total Guidance System provided navigation control for the long-distance alignment accuracy Surface and subsurface monitoring for settlement Continuous 24/7 operations

Outcome

Successful installation in 37 mining days. No settlement along alignment or disruption to GTAA operations.

Sewer provides added capacity to run twin tunnels in tandem or divert sewer flows for inspection. Alignment was on line and grade with low overall jacking tonnage.